Description
HMS-2S is designed for two-stage applications: The first-stage alarm is activated when the pull-down lever is manually triggered; while the second-stage alarm is activated when the key switch is turned to `ON.’
HMS-2S is designed for two-stage applications: The first-stage alarm is activated when the pull-down lever is manually triggered; while the second-stage alarm is activated when the key switch is turned to `ON.’
HMS-2S is designed for two-stage applications: The first-stage alarm is activated when the pull-down lever is manually triggered; while the second-stage alarm is activated when the key switch is turned to `ON.’
Weight | 0.3 lbs |
---|---|
Manufacturer | Siemens Industry, Inc. |
Brand | Siemens |
Condition | New |
Unit of Measurement | EA (Each) |
Type | Pull Station |
Color | Red |
Construction | Polycarbonate |
Location | Indoor |
Marking | FEU, FIRE |
Operation | Key Reset, Single-Action |
Programming | DPU |
Protocol | FireFinder, XLS |
Series | |
Compatibility | |
Production Status | Active |
You must be logged in to post a review.
Weight | 0.3 lbs |
---|---|
Manufacturer | Siemens Industry, Inc. |
Brand | Siemens |
Condition | New |
Unit of Measurement | EA (Each) |
Type | Pull Station |
Color | Red |
Construction | Polycarbonate |
Location | Indoor |
Marking | FEU, FIRE |
Operation | Key Reset, Single-Action |
Programming | DPU |
Protocol | FireFinder, XLS |
Series | |
Compatibility | |
Production Status | Active |
There are no reviews yet.
You must be logged in to post a review.
Monday to Thursday: 8 AM – 7 PM (EST)
Friday: 8 AM – 5 PM (EST)
(888) 497-0290
[email protected]
[email protected]
[email protected]
Reviews
There are no reviews yet.